Inhaltsverzeichnis anzeigen | ![]() |
On this tab, you can assign control structures, such as cost centres, projects or credit cards to a payment condition.
For each control structure, select the appropriate option:
Option |
Description |
---|---|
Use no accounting |
No special accounting is assigned |
Same accounting as corresponding item |
The same accounting as the corresponding order item is used. Note: Only visible if item-related conditions have been configured |
Following accounting |
An accounting type is assigned to this condition that is independent of the accounting of the corresponding order/order item. You can either select an accounting type from the selection list or create a new accounting type in the input box (if this is set up) and confirm with the confirmation button For assignment, see the basic contract page. |